We pride ourselves in providing a whole range
of high-class, customizable and innovative seamless pipes and
tubes using state-of-art technology. We also manufacture ERW pipes
along with the seamless pipes. This ERW plant is India's first
and only Plant capable of manufacturing ERW Pipes upto 21"
Outer Diameter. We have also diversified into Power Generation
with 7 MW wind power project at Satara Maharashtra, thus committing
ourselves to environment friendly GREEN POWER.
Our
engineers and
technicians
are among the
best and we
can boast quality
and productivity
levels on par
with those of
any seamless
pipes manufacturing
facilities in
the world.
Listed are years and the associated events
:
-
1988 Incorporated
-
1991 IPO Launched
-
1992 Seamless plant upto 7" OD Commissioned
- 1993 API Certification & Production of Casing & Line Pipes
- 1995 IBR Certification by Central Boiler Board
-
1996 ISO Certification
by BVQI
- 2000 ERW Plant upto 21" OD Commissioned
- 2001 7MW Wind Power Plant Commissioned
- 2004 Higher Dia Seamless Pipes upto 14" OD Commissioned
- 2004 JV facility with Hydril USA for premium Connections Commissioned
- 2005 Launched Foreign Currency Convertable Bonds (FCCBs) issue of USD 75 Million.
As of date 99% of the Issue Size has been converted in Equity Shares
- 2006 Coating facility for Oid & Gas Sector Commissioned.
- 2006 MSL has been awarded as Singapore for "BEST UNDER A BILLION COMPANY" by
Forbes Asia Magazine.
|